Thursday, November 10, 2016

in a dead heat with Mother Nature


At this time in a construction schedule 
it’s always a race to close up before winter.



If they can get the siding on and the windows installed, space heaters can allow the carpenters to work inside right through the winter.


I remember making foil-wrapped grilled cheese’s on a construction heater like this when I was a kid.


But this crew isn’t going to make it.

Not by a long shot.
January 23, 2016

No comments:

Post a Comment